Generolo Jono Žemaičio Lietuvos karo akademija logo


  • List of journals
  • About Publisher
Login Register

  1. Home
  2. Journals
  3. cndcgs
  4. Issues
  5. Volume 2018, Issue 1 (2018)
  6. Assessment of River Crossing Possibility ...

Challenges to national defence in contemporary geopolitical situation

Information
  • Article info
  • Cited by
  • More
    Article info Cited by

Assessment of River Crossing Possibility with Existing Pontoon Bridge
Volume 2018, Issue 1 (2018), pp. 25–31
Marian Janusz ŁOPATKA  

Authors

 
Placeholder
https://doi.org/10.47459/cndcgs.2018.3
Pub. online: 25 April 2018      Type: Article      Open accessOpen Access

Published
25 April 2018

Abstract

In the paper the possibility of river crossing in different conditions are described. The influence of river and equipment characteristics are analyzed and existing unitation on crossing capacity are indicated. Moreover, the unique demand for river crossing in Eastern Europe are defined.

Cited by PDF XML
Cited by PDF XML

Copyright
No copyright data available.

Keywords
river crossing ribbon bridge military load classification hydrodynamic stability bridge capacity

Metrics
since October 2020
741

Article info
views

0

Full article
views

429

PDF
downloads

210

XML
downloads

Export citation

Copy and paste formatted citation
Placeholder

Download citation in file


Share


RSS

Generolo Jono Žemaičio Lietuvos karo akademija Šilo g. 5A., LT-10322 Vilnius, el.p: lka@mil.lt

General Jonas Žemaitis Military Academy of Lithuania  Šilo Str. 5A, LT-10322 Vilnius, Lithuania, e-mail: lka@mil.lt

Powered by PubliMill  •  Privacy policy